Founded in 2013, the company is located in Chaozhou City, Guangdong Province, and its industry is gas production and supply. The company's natural gas terminal project is a large-scale energy infrastructure construction project integrating LNG loading and unloading, storage and transportation, transmission and distribution. The main purpose is to receive imported LNG source, connect Chaozhou high-pressure natural gas pipeline network and national trunk and branch pipeline network through high-pressure natural gas export pipeline, and distribute natural gas to Chaozhou, eastern Guangdong, Guangdong and surrounding areas.
The planned construction scale of natural gas receiving station is 6million tons / year, and it will be able to expand to 12million tons / year in the long term.Liquefied natural gas (LNG) terminal project mainly includes: LNG terminal project, supporting wharf project, natural gas export high-pressure pipeline project.
LNG Terminal Project: 467 mu of land will be acquired in the first phase, and three LNG storage tanks, LNG gasification project, tanker transportation project and supporting process units will be built. In the second phase, 400 mu of land will be acquired for the construction of 4 LNG tanks and supporting process units.
Supporting Wharf Project: build a 3 ~ 21.7 m3 LNG ship loading and unloading berth and a 30000 ~ 80000 m3 LNG ship shipping berth for LNG ship shipping; A working berth and corresponding supporting facilities; Excavate 7 km special channel to connect with Chaozhou port public channel; About 1.5 km breakwater will be built about 600 meters offshore.
Supporting natural gas export pipeline project: the liquefied natural gas received and unloaded in this project is transported to Raoping off load station and Tiepu off load station through high-pressure natural gas export pipeline after gasification, which is connected with Chaozhou natural gas high-pressure pipeline network (Chaozhou natural gas one network project) and Guangdong Provincial pipeline network.
The first phase of the natural gas terminal project is planned to invest 7.4 billion yuan; The construction investment of LNG carrier is 2.3 billion yuan; The second phase investment is 4 billion yuan; The total investment of the project is 13.7 billion yuan.
Prediction of social and economic benefits of the project: after the first phase of the project is put into operation, the annual output value is expected to reach 13 billion yuan; Thousands of jobs; More than one billion yuan of tax revenue; Drive the development and construction of natural gas cogeneration project, natural gas distributed energy project and cold energy utilization project, provide clean energy for eastern Guangdong and surrounding areas, and assist the construction and development of Guangdong, Hong Kong and Macao Bay area.
Business demands: the company currently plans to raise 600-900 million yuan in equity financing.